How to Change the Calender in Primavera in the middle of the project

Updated: May 16, 2018

Hi, Lets see How we can change the Calendar once the schedule is prepared.

As per the Scheduling Philosophy, Calendar has to be set before beginning the schedule preparation.


To set the Default calendar,

Step 1:

Go to Enterprise>>Calendars,



Step 2:

Tick the Calendar which you want to make it default,


Step 3: